Monday, March 1, 2010

Update

The kitchen project has been moving slowly the last two weeks. The things that have taken place are: three of the four ceiling lights have been hung, the walls have been painted three times, glass installed in the doors of the upper cabinets, electrical plugs and outlets change out, and windows in dining area trimmed out. I confess that the reason the walls had to be painted three times was because of me. I wanted the walls to look like leather with a glaze, but I did not understand how to do it. I finally gave up and went back to a solid color. This weekend we had several lessons on how to buy granite countertops. We (I) still have not picked out one. Wow, what an experience. The bottom cabinets should be ready this week. I did see them Saturday, and they are almost finished. We were short on electrical wiring for the oven. Rick has to get some more before we can finish the electrical part of this. However, we are 28 days into the project. The only inconvenience other than the house looking like a bomb exploded is that we cannot find the dinner plates. So on the Walmart list for this week is paper plates.

No comments:

Post a Comment